Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

ERIC ROP

NAKURU

Summary

Mechanical Engineer with experience in Geothermal steam gathering system designs, construction and project supervision, reservoir modelling and simulation. Spent time with KenGen has revolved around improvement of well testing equipment , geothermal power plants concept reviews and project implementation. However, also have experience in conducting field optimization studies, procurement as well as project budgeting, tracking and monitoring.

Overview

16
16
years of professional experience

Work History

Principal Steamfield Engineer

Kenya Electricity Generation Company
Naivasha
01.2010 - Current
  • In charge of steamfield designs, construction, operation and management. Manage team of 40 Engineers and Technicians.
  • Design and construction manager for connection of new wells to existing power plants to address steam shortage and seal revenue leakages.
  • Supervised and managed construction of 280 MWe steamfield for new power plant.
  • Conducted research to test and analyze feasibility, design, operation and performance of new well testing equipment which reduced noise levels by 30 decibels making company operations noise level limit regulations compliant.
  • Researched non-conventional power generation techniques to help company utilize non productive wells in Olkaria which is under implementation by GreenFire Energy Inc CA USA.
  • Carried out numerical model update for Olkaria Geothermal field which is used to guide field development plan and manage geothermal reservoirs.
  • Evaluated emerging technologies for potential implementation, staying up-to-date with advancements in systems engineering methodologies.
  • Reduced costs by conducting thorough vendor evaluations and negotiating favorable contract terms for hardware purchases.
  • Conducted rigorous testing to validate system functionality, ensuring seamless integration with existing components.
  • Ensured compliance with industry standards by conducting regular audits of network architectures and security policies.

Site Engineer

Abe Tech (EA) LTD
Nairobi , 30
11.2008 - 05.2009
  • Oversaw construction and installation of pipe works and mechanical components for 52 MWe thermal power plant project managing team of 25 employees.
  • Review of power plant mechanical and piping drawings .
  • Ensuring that mechanical installations meet quality specifications as per contract and meet strict project completion timelines.
  • Maintenance of contractors safety policy and ensuring that employees stick to safety requirements and regulations.
  • Oversaw quality control, health and safety matters for construction teams.

Production Engineering Intern

H Young & Co (E.A.) Ltd
Nairobi , 30
05.2008 - 09.2008
  • Delivered 100% of required workshop fabricated mechanical equipment in support of mining mining construction contracts for Buzwagi Gold Mine located in shinyanga Tanzania.
  • Interpretation and simplification of engineering drawings.
  • Design by AutoCAD and preparation of working drawings from clients main drawing.·
  • Preparing bill of quantities and maintenance of production records. Dispatching and ensuring of timely and efficient production in coordination with site engineers.

Education

Master of Engineering - Reservoir Engineering

Akita University
Akita, Japan
03.2018

Bachelor of Technology - Mechanical And Production Engineering

Moi University
Eldoret, Kenya
10.2007

Skills

  • Product Development
  • Analytical skills
  • Project Management
  • Budget Control
  • Complex Problem-Solving
  • Team Leadership
  • Strategic Planning
  • Good communication skills
  • Technical Reporting

Accomplishments

  • Project Manager connection of steam gathering system to existing power plant
  • Steamfield construction Engineer/supervisor for 280 MWe geothermal power plant
  • Reservoir numerical model update for Olkaria Geothermal field
  • Designed, supervised construction and testing of improved well test equipment to reduce noise levels by over 30 dB

Timeline

Principal Steamfield Engineer

Kenya Electricity Generation Company
01.2010 - Current

Site Engineer

Abe Tech (EA) LTD
11.2008 - 05.2009

Production Engineering Intern

H Young & Co (E.A.) Ltd
05.2008 - 09.2008

Master of Engineering - Reservoir Engineering

Akita University

Bachelor of Technology - Mechanical And Production Engineering

Moi University
ERIC ROP