Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
FREDERICK OWINO ADEMBA

FREDERICK OWINO ADEMBA

Mechanical Engineer
Nairobi

Summary

CAREER PROFILE SUMMARY I am a vastly experienced Electromechanical Engineer QA/QC with over 15 years of experience, I have comprehensive knowledge of Engineering Installations, Maintenance, Welding Fabrications, Manufacturing Production, Plant equipment /Automotive Engineering, Factory operations, Petroleum Operations, Sales, and Engineering constructions site/works management focusing on the economy, Industrial safety, reliability, quality, and sustainability. I am able to ensure that any site Construction machines/Equipment be it in manufacturing, production, Automotive, maintenance, or operation conforms to the highest Engineering standards. My varied experience in the petroleum Energy sector, Sugar manufacturing factories, pipeline and storage tanks constructions, General Engineering maintenance, Manufacturing management, and Business administration, with the skills I have gained therein including Mechanical and Electrical Engineering, system commissioning, project management, and risk management can be transferred across all sectors. I have a consistent track record of successfully completing projects from the concept and detail of the design through to implementation, commissioning, and operations. Additionally, I also have a comprehensive understanding of Health, Safety, and Environmental (HSE) regulations. (OSHA in general) with AutoCAD Experience. My focus is to secure a position where my abilities and experience will be utilized in providing long-lasting solutions to the ever-evolving Engineering Construction World. Resourceful Project Manager with [Number] years of expertise in organizing business operations, financial oversight and resource management to achieve smooth flow and project operations. Leads procurement of resources including equipment and supplies. Monitors projects by adhering to production schedule and budget, managing production team, identifying problems and providing targeted solutions. Knowledgeable in accounting principles, bookkeeping, budget and financial management. Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. Talented professional considered knowledgeable leader and dedicated problem solver. Brings 15 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements. Professional Project Management Specialist with experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

30
30
years of professional experience
17
17
years of post-secondary education

Work History

Project Manager

Center Star Kenya Ltd
Nairobi
07.2016 - 04.2018
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Identified plans and resources required to meet project goals and objectives.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Provided detailed project status updates to stakeholders and executive management.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Prepared and submitted project invoices for review and approval.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.
  • Reported regularly to managers on project budget, progress and technical problems.
  • Recruited and oversaw personnel to achieve performance and quality targets.

Mep Site Engineer Pipelines, Workshop/Field

ICM Gruppo SPA
Machakos
10.2020 - Current
  • Managing general MEP Plants sites, Workshop activities, logistics, and transportation
  • Assisting the Hr department in recruiting New section staff and allocation of site activities
  • Creates and Manages employees’ schedules and daily tasks
  • Training of workshop employees and supervision of tasks allocated to completion as per timelines in the water treatment plant construction site (WTP) and Wastewater reclamation facility (WRF) construction sites
  • Plan and organize procurements of tools, spares, equipment, and site material handling coordination, inclusive of inventory management
  • Supervise maintenance of construction plant equipment at the workshop
  • Make reports/records on the progress of machines and equipment performance
  • Participate in Maintenance, piping network welding inspections, and installation of new equipment
  • Coordinate vehicles, equipment, and mechanical activities, site pipeline welding, pipeline coating inspection/ plumbing installations work on construction sites within the plant as assigned
  • Supervise staff to adhere to company rules, regulations, health, safety, and Environment
  • Interpret Technical drawings and execute as required for fabrication works and installations on construction sites
  • Make Reports on work progress and completions as per timelines of every task
  • Supervise automatic solid waste carbon steel pipeline laying installation construction network
  • Advice and led the field team on pipeline laying and welding installations of the solid waste automatic system
  • Coordinate pre-commissioning inspections of storm networks, water supply networks, and high, medium, and low voltage conduits networks
  • Ensure that all contract specifications and guidelines are adhered to at all times during the commencement/construction/commissioning and handover periods of the project
  • Ensure that material submittals are issued with the relevant consultant’s requirements and that they are submitted in a format that indicates compliance with specifications and country of origin and maintaining them in a register
  • Ensure that all Method Statements & Risk Assessments are in line with company HSE/QA-QC procedures and suit the appointed Consultant’s requirements and are recorded on a usable platform
  • Make sure that all compliance statements, testing and commissioning, spares, warranties, and delivery period requirements are upheld at all times
  • Manage a procurement/long lead item schedule in tandem with line managers indicating delivery dates and the status of the pending material/s deliveries and follow-up delivery dates whilst recording any issues which may impact program delivery
  • Control the dissemination of contractual documents (drawings/contracts/specifications) – usable drawings and information must be issued to the relevant site team members to be able to carry out works per the specifications and contract requirements within the time frame of the program
  • Changes to the scope of work must be forwarded to the Commercial Team immediately
  • Manage the Drafting team on site and make sure that all drawings are checked and signed off prior to issuing to the relevant site teams
  • A weekly record of Drafting output with a four-week look ahead and drawing submittal must be maintained at all times
  • Information and Engineering that is coordinated with Draughting Teams have to be accurate and detailed
  • Apply value Engineering and Planning to all facets of the contract, and produce/submit a VE document during a review
  • Carry out/manage full material take-offs and issue the relevant measurables in tandem with the SEs & CMs and confirm compliance requirements are adhered to at all times
  • Make sure that all Design, Engineering, and Installation details are checked for compliance, usability, and functionality and are in line with the overall design specifications and requirements
  • Making sure that Testing & Commissioning Requirements, Spares Requirements, Warranty, and Defect Liability Periods are recorded and agreed upon with the relevant suppliers before issuing PRs and releasing LPOs
  • Carry out necessary design validation, as required by Project specifications
  • Review and verify all components for compliance with project specifications
  • Assist in the scope, review, and justification of validation work
  • Assist in leading installation work at the site in compliance with Project Quality Plans & Programs
  • Direct, monitor, and control the activities of specialist subcontractors
  • Liaison with MEP Supervisor Engineers, Inspectors, and relevant Staff
  • Attend meetings as deemed necessary
  • Assist in Testing and Commissioning of Hydro pipelines and other related engineering facilities installations
  • Facilitate and attend to problem-solving that may arise at the site.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Oversaw quality control and health and safety matters for construction teams.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Applied engineering principles to troubleshooting and followed up on defined corrective actions to prevent reoccurrences.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Developed SOPs and change controls pertaining to setup, maintenance and operation of equipment, facility and utilities.
  • Facilitated and led site engineering projects relating to new or upgraded equipment, facilities and quality initiatives.
  • Developed safety awareness program consisting of construction safety audits and safety meetings.
  • Loaded, unloaded and identified building materials, machinery and tools to distribute tools to appropriate locations.
  • Kept work areas clean and organized.
  • Drove company trucks carrying materials and equipment from warehouse to sites.
  • Lubricated and cleaned machines and work tools to maintain optimum performance.
  • Operated pressure washers, jackhammers and blowtorches.
  • Arrived for work at scheduled time, properly dressed and ready to contribute to team success.

Electromechanical Engineer Contractor

B Braun Pharmaceutical Company
Athiriver
11.2019 - 08.2020
  • Ensured Machines/Equipment was Installed, commissioned, and maintained
  • Ensured safety and quality standards are maintained for machines and equipment relied upon for maximum production
  • Ensured and maintained the staff is trained on new machines
  • Planned and supervised all installation and commissioning of machines
  • Checked inventory availability of spares and prepared maintenance plans for machines and equipment preventive and overhaul services
  • Reported to the production manager on the overall performance of the machines and availability for effective production
  • Trained staff on operations, Trouble, shooting, and Maintenance of production machines
  • Ensured Effective handover of Installed production Machines to the client.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Estimated project costs and resource allocation to forecast budget requirements and monitor adherence.
  • Read and analyzed blueprints and project documentation to develop workflows and strategy.
  • Inspected and performed validation testing for designed systems and third-party installations.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Developed engineering documentation detailing system requirements and diagnostic procedures.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Mentored junior engineers and new hires in job-specific tasks and application of electrical processes.

Production and Sales Manager

Falcone Bakery
Kitengela Kajiado
05.2019 - 10.2019
  • Managed production of bakery products within the factory, line production, and sales to customers for resale outlets
  • Organised all purchases for all the Material requirements for the production as in budgeting and labor allocation to staff
  • Accounted for sales and payment of staff salaries
  • Maintained book of accounts
  • Reported and advised on the state of financial procurements to the company CEO, and on the general KPI of the bakery
  • Hired and trained new staff.
  • Resolved customer issues quickly to close deals and boost client satisfaction.
  • Conducted team meetings to reinforce goals and objectives and set clear expectations about policies and procedures.
  • Maintained ethical and positive working environment to reduce turnover and promote high retention rates.
  • Coached and counseled sales personnel, assisting with individual selling efforts and helping sales representatives reach targets.
  • Coached employees in successful selling methods and encouraged cross-selling to drive revenue.
  • Maintained relationships with customers and found new ones by identifying needs and offering appropriate services.
  • Grew sales and boosted profits, applying proactive management strategies and enhancing sales training.
  • Identified, hired and trained highly-qualified staff by teaching best practices, procedures, and sales strategies.
  • Engaged in product training, demonstrations, consumer awareness, branding, and acquisition initiatives to raise awareness and revenues.
  • Achieved sales goals and service targets by cultivating and securing new customer relationships.
  • Communicated product quality and market comparisons by creating sales presentations.
  • Boosted marketing, reviewed pricing strategies and expanded distribution channels to increase sales revenue.
  • Built relationships with customers and community to establish long-term business growth.
  • Managed revenue models, process flows, operations support and customer engagement strategies.
  • Increased profit margins by effectively controlling budget and overhead and optimizing product turns.
  • Aligned company goals with customer outcomes and increased satisfaction by automating contact management systems.
  • Recruited, interviewed and hired employees and implemented mentoring program to promote positive feedback and engagement.
  • Achieved established KPI for company, regional team and individual performance through teamwork and focus on customers.

Electromechanical Pump/Structural Engineer

Zakhem International Company Limited
Nairobi and Mombasa
11.2017 - 03.2019
  • Responsibilities
  • Supervised Mainline Pipeline and Stations Pumps, valves Installations, Mechanical Engineering structures alignment, fitting, welding, and fabrication, and system commissioning on Mombasa Nairobi Multi-product oil pipeline line one replacement project No SU/QT/032N/13
  • Inspected, repaired, and maintained mechanical installations including pumps, and valves
  • Power generating engines, firefighting equipment, refrigeration, and air conditioning
  • Inspected welding and structural mechanical fabrications in both fields and workshops
  • Supervised the technicians and artisan and allocate work in different sites as necessary
  • Ensured commissioning of pumps, valves, generators, and machines on different sites
  • Ensured Repairs and maintenance of different classes of valves, plant machines, and mainline pumps
  • Ensured compliance with the set standards and operating procedures of ZIC
  • Making weekly reports and was part of a team in fault findings
  • Attended to breakdowns service of plant machines and equipment whenever called upon at different sites
  • Fault find as the cause of breakdowns on plant equipment, pumps, valves, and power generators breakdown whenever it occurs
  • Organized progress site meetings, and planned and executed site activities
  • Achievement- Part of the team of Engineers that constructed to completion of the New 24 inches diameter oil Pipeline for a distance of 480kms in a record of 3 years without a single safety incident Resulting in a 70% petroleum uplift in Efficiency.
  • Completed accurate engineering calculations for weights, loads and other metrics using both manual and digital methods.
  • Assisted drafters in developing structural design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
  • Verified construction documentation to meet client requirements and vision.
  • Inspected and evaluated existing buildings for structural deficiencies and code violations.
  • Published technical reports on structural conditions, repair cost estimates and corrections required to meet local building codes.
  • Monitored implementation of necessary safety and redundancy principals in design and construction of new structures.
  • Traveled to build sites to collaborate with construction personnel and to confirm compliance with design parameters and regulations.

Project Mechanical Engineer

Rigelsistemi Steel Company Ltd
Nairobi and Mombasa
07.2017 - 10.2017
  • Ensured automation of petroleum pipeline valves, transformed from manually operated to Motor operated valves by installing the motorized actuators
  • Ensured new motorized actuators were installed as the contract required
  • Complied with safety requirements of KPC depots standards
  • Handled Weekly reports submission
  • Allocated work and supervised the technical team in all stations of work
  • Inspected New Motorised actuators
  • Fuelled and serviced vehicles and plant equipment used at the site
  • Measured and machined actuators gear systems and commissioned new actuators installed
  • Supervised installations, operations, and maintenance of equipment for all stations in record time to completion
  • Achievement: Automated the whole Kenya pipeline company Petroleum valves operations
  • Supervised steel Roll forming works at the factory for cabling trays, warehouse rack shelves, highway guardrails, and metal cabinets
  • Installed, Planned, and Maintained different types of Roll forming machines within the metal sheet manufacturing factory shop.
  • Wrote and revised maintenance procedures.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Communicated project requirements and areas for improvement in design review meetings.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Suggested cost saving proposals on make-versus-buy analysis or alternative sourcing.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Altered and modified designs to meet requirements and eliminate malfunctions.
  • Tested and analyzed equipment design and performance feasibility to determine potential ROI.
  • Surveyed potential project sites before design, checking for space restrictions, mechanical feasibility and manufacturers guidelines.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Identified suitable materials for production use that aligned with environmental concerns and budget constraints.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
  • Interpreted blueprints, technical drawings, schematics and computer-generated reports for new product development.

Project Manager

star company Ltd
Nairobi mombasa line
07.2016 - 05.2017
  • Responsibilities
  • General Management and supervising the Rehabilitation Maintenance of the Mombasa-Nairobi multi-product oil pipeline Project, contract No SU/QT/064N/15
  • Pipeline welding and coating inspections
  • Ensured successful initiation, planning design, execution, monitoring, controlling, and closure of the project
  • Responsible for the delivery of the project with authority and responsibility from the center star construction company projects Board to run the projects on a day-to-day basis, and fully manage the projects team for successful completion
  • Ensured Mechanical, Electrical, and Civil Engineering works are executed to the success of the project
  • Ensured recruitment of technical and non-technical personnel as necessary
  • Ensured supervision of the entire project works to completion
  • Solved disputes to agreeable solutions arising within the project’s sites
  • Wrote Monthly project progress report reports
  • Visited sites and attended site meetings on the position of percentage work completed
  • Ensured safety procedures and rules are strictly followed by all construction site staff, suppliers, and all customers
  • Incorporated and implemented changes within the construction sites as advised by superiors and directors
  • Ensured the project progresses as planned by supervising all sections involved in the project as stores, supplies, and accounting and finance departments
  • Ensured all items and materials purchased are inspected before dispatch to sites, as in earthmoving machines (plant machines), welding and fabrications machines, and metal cutting instruments as in gas and pipe cutters and benders
  • Achievements-Established and reinforced maintenance of the aging oil pipeline and safety procedures and enabled work to be completed as per plan and budget
  • Hence the Company ranked as the best petroleum products pipeline and storage tanks contractor.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Managed projects from procurement to commission.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Developed and implemented strategic project plans to meet business objectives.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Monitored project progress, identified risks and took corrective action as needed.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.
  • Facilitated workshops to collect project requirements and user feedback.
  • Recruited and oversaw personnel to achieve performance and quality targets.

Depot Operations Manager

Petrocity Energy Kenya Ltd
Konza Makueni
11.2013 - 06.2016
  • Ensured that General Administration and daily depot operations are conducted as per the standards of Petrocity Energy Kenya Ltd
  • Supervised terminal operations, as in communication with commercial marketers and fuel carriers for efficient loading and pipeline supply in time and approval of batch receipts
  • Checked safety procedures and rules adhered to by all the terminal, construction site staff, and customers/clients
  • Administered petroleum fuel quality control measures through the laboratory including coordinating and obtaining laboratory reports for filing
  • Incorporated and implemented changes within the terminal and construction sites as advised by superiors and directors
  • Tallied terminal daily product and tabulate reports of stocks and amount moved
  • Monitored stock holding of all oil marketers in the depot storage facility
  • Receipted, dispatched, and monitoring of fuel product batches
  • Supervised fuel loading in trucks at the Gantry
  • Checked and monitored by measurements of fuel products in the storage tanks
  • Trained and conducted safety drills for new operations staff on petroleum fuel handling
  • Achievement-Achieved 60% greater efficiency in operations, maintenance, and safety procedures within the depot.
  • Devised processes to boost long-term business success and increase profit levels.
  • Established positive and effective communication among unit staff and organization leadership, reducing miscommunications, and missed deadlines.
  • Introduced new methods, practices, and systems to reduce turnaround time.
  • Identified and resolved unauthorized, unsafe, or ineffective practices.
  • Implemented process improvement to shape organizational culture, optimize procedures for higher efficiency and help company evolve and grow.
  • Directed initiatives to improve work environment, company culture or overall business strategy.
  • Developed and maintained relationships with external vendors and suppliers.
  • Developed systems and procedures to improve operational quality and team efficiency.
  • Supervised operations staff and kept employees compliant with company policies and procedures.
  • Managed inventory and supply chain operations to achieve timely and accurate delivery of goods and services.
  • Developed and implemented strategies to maximize customer satisfaction.
  • Led hiring, onboarding and training of new hires to fulfill business requirements.
  • Increased profit by streamlining operations.
  • Interacted well with customers to build connections and nurture relationships.
  • Trained and guided team members to maintain high productivity and performance metrics.
  • Observed each employee's individual strengths and initiated mentoring program to improve areas of weakness.
  • Updated and resolved incidents and managed accessorial charges objectively while maximizing profit.
  • Tracked employee attendance and punctuality, addressing repeat problems quickly to prevent long-term habits.
  • Scheduled employees for shifts, taking into account customer traffic and employee strengths.
  • Trained new employees on proper protocols and customer service standards.
  • Assisted in recruiting, hiring and training of team members.
  • Launched staff engagement, gender diversity and cultural programs in addition to robust reporting tool that increased operational quality.
  • Recruited, hired, and trained initial personnel, working to establish key internal functions and outline scope of positions for new organization.
  • Handled problematic customers and clients to assist lower-level employees and maintain excellent customer service.

Pipeline Maintenance Supervisor

Corrosion Controls, Kenya Pipeline Company Ltd
Nairobi,Mombasa,Kisumu and Nakuru
11.1997 - 09.2013
  • Ensured (Petroleum pipelines and pump Installations)
  • Repair and maintenance of the fuel pipes network, wayleaves, and storage facilities
  • Maintained field pipelines, workshop facilities, and equipment such as pumps, valves, plant machinery, power generators, welding machines, and metal-cutting/forming machines & instruments
  • Checked safety procedures and rules adhered to by all the terminal, construction site staff, and customers/clients
  • Monthly inspection and inventory of emergency tools and equipment for mainline maintenance
  • Supervision of contractors in the construction of new fuel pipelines and storage tanks (floating roofs and con fixed roofs)
  • Repaired the aging petroleum pipelines
  • Supervised fiber optic cable laying by Telecom Kenya Limited along the fuel pipeline way leave networks in Kenya
  • Maintained aging fuel pipelines by coating/painting and welding sleeves on corroded areas and storage facilities
  • Attended to fuel recovery and repair /vandalized pipelines
  • Attended and repaired plant equipment breakdowns on sites
  • Supervised and allocated duties to Technicians and artisans on the way leaves/sites
  • Ensured inspection and Installation of new Pumps, valves, power generators, and other production plant machines
  • Ensured workshop jobs such as welding and fabrications are done as necessary
  • Ensured breakdowns of pumps, valves, strainers, power generators, plant machinery, and fire hydrant system are attended to in time
  • Ensured general cleanliness/administration of the petroleum depot assigned
  • Supervised maintenance workshop jobs and recorded/documented all activities for management data
  • Wrote Monthly reports of the terminal operations and Plant maintenance to the management
  • Maintained the pipeline installations so that there were no frequent breakdowns hence the company was able to achieve its required production effectively and efficiently
  • Achievement-Saved over 70% on maintenance and operations expenditures.
  • Maintained compliance with company policies, objectives, and communication goals.
  • Achieved results by working with staff to meet established targets.
  • Enforced rules and regulations outlined in company manual to set forth expectations comprehensibly and consistently.
  • Monitored workflow to improve employee time management and increase productivity.
  • Maintained clean and well-organized production areas to avoid violations or unnecessary work delays due to hazards or inefficient layouts.
  • Mentored newly hired employees on operating equipment and safety and developed training manual to use for reference.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Created successful work schedules for each team member to maintain deadlines and fully staff shifts.
  • Identified unsafe or unhealthful workplace conditions or hazards to enforce safe work practices and procedures.
  • Conducted routine inspections to check quality and compliance with established specifications.
  • Provided reporting for forecast analysis and ad-hoc reporting in support of decision-making.
  • Maintained overall safe work environment with employee training programs and enforcement of safety procedures.
  • Evaluated staff performance and provided coaching to address inefficiencies.
  • Educated staff on organizational mission and goals to help employees achieve success.
  • Maintained database systems to track and analyze operational data.
  • Conducted regular reviews of operations and identified areas for improvement.

Depot Operations Technician Engineer

Kenya Pipeline Company Ltd
Mombasa
02.1994 - 10.1997
  • Ensured that Kipevu oil storage facility (KOSF) operations procedures are done to the requirements of the Kenya pipeline standards
  • Ensured transferring of petroleum oil by pumping downstream to the storage depots along the pipeline as scheduled
  • Supervised fuel loading in trucks at the Gantry, adhering to safety procedures and rules in the depot and guiding other staff and customers on the same
  • Monitored stock holding of all oil marketers in the depot storage facility
  • Checked and monitored by measurements of fuel products in the storage tanks
  • Responsible for the mechanical maintenance of the Oil Storage Terminal
  • Responsibilities include: maintaining the Terminal’s mechanical assets in good working condition and improving the asset operation in such a way that reliability is increased and the cost is reduced;
  • Preserving warehouse equipment in good order and following on minimum stock;
  • Coordinating service vendors or contractors, working on all mechanical equipment, Valves, Pipelines, Truck Loading, Vapor Recovery Units, Marine Loading Arms, Gangways, Jetty Structure, Corrosion Management Systems, and performing quality control on the work executed as per the guidelines of the Kenya pipeline work instructions
  • The job interfaces between multiple internal and external resources, to ensure Terminal equipment is meeting Kenya pipeline HSE, reliability, and efficiency standards
  • Reports to the Maintenance & Repairs Manager
  • Achievement-Achieved 60% greater efficiency on product deliveries downstream.
  • Improved team output by improving processes to eliminate operational bottlenecks.
  • Researched database failures and collaborated with operations team to resolve problems.
  • Integrated new technologies to better meet project needs.
  • Documented correspondence with associated details and assigned follow-up work to staff members.
  • Provided reporting for forecast analysis and ad-hoc reporting in support of decision-making.
  • Generated reports detailing findings and recommendations.
  • Maintained overall safe work environment with employee training programs and enforcement of safety procedures.
  • Educated staff on organizational mission and goals to help employees achieve success.
  • Conducted regular reviews of operations and identified areas for improvement.
  • Gathered, organized and input information into digital database.
  • Observed packing operations to verify conformance to specifications.
  • Helped meet changing demands by recommending improvements to business systems or procedures.

Mechanical Technician Engineer (Production workshop)

Mumias Sugar Company Ltd
Kakamega
11.1993 - 01.1994
  • Tasked with preparing schematic drawings for the company facilities, sketching assorted spare parts drawings for the machine shop, and Office filings of drawings
  • Ensured adherence to factory safety and regulations as per the standards of Mumias Sugar Factory
  • Participated in Installing, operating, and maintaining of factory boiler which is a high-pressure vessel within the sugar factory, creating electric energy from the generators and bagasse used for production
  • Boiler Installation, operation, and maintenance
  • Achievement-Part of the team that produced initial Industrial schematic drawings and created electric power from the bagasse that is used within the factory and injection into the power grid.
  • Identified mechanical problems and determined best solutions for correction.
  • Performed troubleshooting, diagnosis, and repair of [Type] equipment.
  • Implemented preventive maintenance measures to decrease emergent issues.
  • Frequently diagnosed mechanical problems and determined how to correct issues.
  • Inspected and tested equipment, machinery and components to diagnose issues, recognize defects, and determine appropriate repairs.
  • Followed guidelines while performing maintenance and repairs to prevent work-related injuries.
  • Kept track of equipment maintenance schedules using computerized maintenance management systems.
  • Resolved mechanical issues using both technical and manual skills.
  • Maintained clean and organized work area to easily locate repairing tools and equipment.
  • Assembled and disassembled equipment to perform repairs and maintenance.
  • Utilized varied tools and equipment to test and troubleshoot mechanical systems.
  • Read and interpreted technical drawings and schematics to understand equipment design and proper maintenance.
  • Monitored equipment performance to confirm proper and efficient function.
  • Kept detailed records of repairs and maintenance for reference in future work.
  • Collaborated with coworkers, discussing assembly, and needed product adjustments.
  • Wrote work orders and parts fabrication requests.
  • Operated variety of tools and equipment to complete mechanical repairs.
  • Researched new technologies related to mechanical engineering to improve designs and processes.
  • Followed optimum preventative maintenance plans for complex mechanical systems.
  • Prepared reports and documentation for mechanical systems and processes.
  • Collected and analyzed data to identify trends and develop solutions to existing mechanical problems.
  • Coordinated installation of systems, machinery, and components.
  • Developed and coordinated effective predictive, preventive, and corrective maintenance approaches.
  • Coordinated with other engineering professionals to coordinate operation of mechanical systems.
  • Conducted root cause analysis to identify source of mechanical system malfunctions.
  • Trained and supervised mechanical engineering technicians in installation and maintenance of equipment.
  • Performed in-depth troubleshooting to diagnose and resolve range of mechanical failures.
  • Completed detailed inspections of electrical and mechanical components to identify issues.
  • Used computer-aided design (CAD) software to create detailed drawings and schematics of mechanical systems.

Education

Bachelor of Arts - Project Management and Leadership

Management University of Africa
Nairobi,Kenya
07.2018 - Current

Diploma of Management - Business management option

Kenya Institute of Management
Machakos,Kenya
05.2013 - 05.2015

Bachelor of Science - Mechanical Engineering

University of Nairobi
Nairobi, Kenya
11.2002 - 05.2007

QA/QC NDT Certification-II-SNT-TC-1A-ISO-9712-Kenya Bureau - Quality Control And Safety Technologies

Standards
Nairobi,Kenya
02.2001 - 05.2001

Diploma - Mechanical Engineering Technician II

Kenya Industrial Training Institute
Nakuru,Kenya
09.1992 - 05.1993

Diploma - Mechanical Engineering Technician I

I- Kenya Industrial Training Institute For Mechanical Engineering
Nakuru,Kenya
05.1991 - 05.1992

Kenya Certificate of Secondary Education - High School Diploma

Bukhalalire High School
Busia,Kenya
01.1987 - 05.1990

Skills

AND COMPETENCIES ACQUIREDundefined

Accomplishments

  • Supervised team of 265 staff members.
  • Resolved product issue through consumer testing.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Saved the company ksh15,600,000.00 over 4 years by implementing a successful productivity improvement plan.

Timeline

Mep Site Engineer Pipelines, Workshop/Field

ICM Gruppo SPA
10.2020 - Current

Electromechanical Engineer Contractor

B Braun Pharmaceutical Company
11.2019 - 08.2020

Production and Sales Manager

Falcone Bakery
05.2019 - 10.2019

Bachelor of Arts - Project Management and Leadership

Management University of Africa
07.2018 - Current

Electromechanical Pump/Structural Engineer

Zakhem International Company Limited
11.2017 - 03.2019

Project Mechanical Engineer

Rigelsistemi Steel Company Ltd
07.2017 - 10.2017

Project Manager

Center Star Kenya Ltd
07.2016 - 04.2018

Project Manager

star company Ltd
07.2016 - 05.2017

Depot Operations Manager

Petrocity Energy Kenya Ltd
11.2013 - 06.2016

Diploma of Management - Business management option

Kenya Institute of Management
05.2013 - 05.2015

Bachelor of Science - Mechanical Engineering

University of Nairobi
11.2002 - 05.2007

QA/QC NDT Certification-II-SNT-TC-1A-ISO-9712-Kenya Bureau - Quality Control And Safety Technologies

Standards
02.2001 - 05.2001

Pipeline Maintenance Supervisor

Corrosion Controls, Kenya Pipeline Company Ltd
11.1997 - 09.2013

Depot Operations Technician Engineer

Kenya Pipeline Company Ltd
02.1994 - 10.1997

Mechanical Technician Engineer (Production workshop)

Mumias Sugar Company Ltd
11.1993 - 01.1994

Diploma - Mechanical Engineering Technician II

Kenya Industrial Training Institute
09.1992 - 05.1993

Diploma - Mechanical Engineering Technician I

I- Kenya Industrial Training Institute For Mechanical Engineering
05.1991 - 05.1992

Kenya Certificate of Secondary Education - High School Diploma

Bukhalalire High School
01.1987 - 05.1990
FREDERICK OWINO ADEMBAMechanical Engineer