Highly skilled Network operations supervisor with over a year of experience at KOKO Networks Limited, specializing in deploying and maintaining technical systems, including KOKO Points and other network hardware. Proven track record in planning, coordinating, and ensuring adherence to installation, calibration, and maintenance schedules, with a strong focus on quality and regulatory compliance. Adept at driving continuous improvement in calibration and maintenance methods to enhance accuracy and throughput in a rapid-growth environment. Demonstrated ability to manage departmental inventory, interface with procurement, and maintain customer satisfaction through professional conduct and effective communication. Committed to developing and retaining high-performing teams through effective selection, training, coaching, and performance management, ensuring operational excellence and alignment with Health, Safety, and Environmental policies
improvement.
rapid growth environment.
evolving needs of the business through effective selection, training, coaching/mentoring,
and performance management.
Projects; Queensway, mutundwe and lugogo substations in Kampala Uganda
Project: lake Turkana wind power
Projects: 33/11 kV capacitance substation in Rivertex Eldoret (KPLC)
132/33 kV Reactor substation in Musaga (KPLC)
132/33 kV Reactor substation in Kiambere (KPLC)
Olkaria 4 power plant (140 mw)
As a dedicated technology enthusiast, I am passionate about staying abreast of the latest advancements in technology, which aligns seamlessly with my professional role at KOKO Networks Limited. My interest spans across various domains, including network hardware, calibration methods, and quality assurance systems. Here’s how my enthusiasm for technology enhances my professional contributions:
Continuous Learning and Adaptation:
Regularly engage with tech journals, online courses, and industry conferences to stay informed about emerging trends and innovations in network operations and quality assurance.
Apply the latest technological advancements to improve installation, calibration, and maintenance processes, ensuring they are in line with cutting-edge standards and best practices.
DIY Electronics Projects:
Work on personal projects that involve building and calibrating small-scale devices, which enhances my practical understanding of the equipment and systems used in professional settings.
Experiment with new technologies and methodologies in a controlled environment, gaining insights that can be translated into improved processes at work.
Implementing Advanced Calibration Methods:
Leverage knowledge of the latest calibration techniques to drive improvements in accuracy and throughput within the rapid-growth environment of KOKO Networks.
Develop and implement standardized metrics and advanced calibration certificates, ensuring high-quality and consistent outputs.
Enhancing Network Operations:
Utilize advanced monitoring tools and software to oversee network hardware performance, identifying and addressing potential issues proactively.
Interface with support functions using modern communication and project management tools, ensuring efficient problem resolution and adherence to regulatory requirements.
Team Development and Training:
Share insights from the latest technological trends with team members, fostering a culture of continuous improvement and innovation.
Conduct training sessions on new technologies and methodologies, ensuring the team is well-equipped to handle current and future challenges.
Optimizing Inventory and Procurement:
Employ advanced inventory management systems to monitor departmental inventory, ensuring timely and cost-effective procurement of necessary equipment.
Implement strategies that leverage the latest technology to manage usage and expenditure effectively.